Easy.
Produce HS510 in SMT line, 60 hrs. Then run in B line , 20hrs. Product qty is 1200pcs/month. Profit is 360K/M.
Then produce CD928 in SMT line, 120 hrs. Then run it in A line , 120hrs. roduct qty is 3600pcs/month. Profit is 1800K/M.
Tatol profit is 2160K/M.
Right? |