标准下载论坛

标题: 转载《部门名称的专有名词》 [打印本页]

作者: 知不道    时间: 2011-10-29 22:52
标题: 转载《部门名称的专有名词》
QS: Quality system质量系统
CS: Customer Serves 客户服务
QC: Quality control质量管理
IQC:Incoming quality control 进料检验
LQCine Quality Control 生产线质量控制
IPQC:In process quality control 制程检验
FQC: Final quality control 最终检验
OQC: Outgoing quality control 出货检验
QA: Quality assurance 质量保证
SQA: Source(supplier) Quality Assurance 供应商质量保证(VQA)
CQA:Customer Quality Assurance客户品质保证
PQA: process Quality Assurance 制程质量保证
QEuality engineer 质量工程
CE:component engineering零件工程
EE:equipment engineering设备工程
ME:manufacturing engineering制造工程
TE:testing engineering测试工程
PPE roduct Engineer 产品工程
IE:Industrial engineer 工业工程
ADM: Administration Department行政部
RMA:客户退回维修
CSDI:检修
PC:producing control生管
MC:mater control物管
GAD: General Affairs Dept总务部
A/D: Accountant /Finance Dept会计
LAB: Laboratory实验室
DOE:实验设计
HR:人资
PMC:企划
RD:研发
W/H:仓库
SI:客验
PD: Product Department制造部
PA:采购(PUR: Purchaing Dept)
SMT:Surface mount technology 表面粘着技术
MFG:Manufacturing 制造
MIS:Management information system 资迅管理系统
DCC:document control center 文件管制中心

厂内作业中的专有名词
QTuality target质量目标
QPuality policy目标方针
QIuality improvement质量改善
CRITICAL DEFECT:严重缺点(CR)
MAJOR DEFECT:主要缺点(MA)
MINOR DEFECT:次要缺点(MI)
MAX:Maximum最大值
MIN:Minimum最小值
DIA iameter直径
DIM imension尺寸
LCLower control limit管制下限
UCL:Upper control limit管制上限
ECN:工程变更
ECO:Engineering change order工程改动要求(客户)
ECR:工程变更需求单
CPI:Continuous Process Improvement 连续工序改善
Compatibility:兼容性
Marking:标记
DWG rawing图面
Standardization:标准化
Consensus:一致
Code:代码
ZD:Zero defect零缺点
Tolerance:公差
Subject matter:主要事项
Auditor:审核员
BOM:Bill of material物料清单
Rework:重工
ID:identification识别,鉴别,证明
PILOT RUN: (试投产)
FAI:首件检查
FPIR:First Piece Inspection Report首件检查报告
FAA:首件确认
SPC:统计制程管制
CP: capability index(准确度)
CPK: capability index of process(制程能力)
PMP:制程管理计划(生产管制计划)
MPI:制程分析
DAS: Defects Analysis System 缺陷分析系统
PPB:十亿分之一
Flux:助焊剂
P/N:料号
L/N:Lot Number批号
Version:版本
Quantity:数量
Valid date:有效日期
MIL-STD:Military-Standard军用标准
ICT: In Circuit Test (线路测试)
ATE:Automatic Test Equipment自动测试设备
MO: Manafacture Order生产单
T/U: Touch Up (锡面修补)
I/N:手插件
P/T:初测
F/T: Function Test (功能测试-终测)
AS 组立
P/K:包装
TQM:Total quality control全面质量管理
MDA:manufacturing defect analysis制程不良分析(ICT)
RUN-IN:老化实验
HI-pot:高压测试
FMI:Frequency Modulation Inspect高频测试
DPPM: Defect Part Per Million
(不良率的一种表达方式:百万分之一) 1000PPM即为0.1%
Corrective Action: (CAR改善对策)
ACC:允收
REJ:拒收
S/S:Sample size抽样检验样本大小
SI-SIV:Special I-Special IV特殊抽样水平等级
CON:Concession / Waive特采
ISO:国际标准化组织
ISA:Industry Standard Architecture工业标准体制结构
OBA:开箱稽核
FIFO:先进先出
PDCA:管理循环
Plan do check action计划,执行,检查,总结
WIP:在制品(半成品)
S/O: Sales Order (业务订单)
P/O: Purchase Order (采购订单)
P/R: Purchase Request (请购单)
AQL:acceptable quality level允收质量水准
LQL;Limiting quality level最低质量水准
QVL:qualified vendor list合格供应商名册
AVL :认可的供货商清单(Approved Vendor List)
QCD: Quality cost delivery(质量,交期,成本)
MPM:Manufacturing project management制造专案管理
KPI:Key performance indicate重要绩效指标
MVT:Manufacturing Verification Test制造验证试产
Q/R/S:Quality/Reliability/Service品质/可靠度/服务
STL:ship to line(料到上线)
NTF:No trouble found误判
CIP:capacity improvement plan(产能改善计划)
MRB:material review board(物料审核小组)
MRB:Material reject bill退货单
JIT:just in time(即时管理)
5S:seiri seiton seiso seiketsu shitsuke
(整理,整顿,清扫,清洁,修养)
SOP:standard operation process(标准作业程序)
SIP:Specification inspection process制程检验规格
TOP: Test Operation Process (测试作业流程)
WI: working instruction(作业指导书)
SMD:surface mounting device(表面粘着原件)
FAR:failure aualysis report故障分析报告
CAR:Corrective action report改善报告
BPR: 企业流程再造 (Business Process Reengineering)
ISAR :首批样品认可(Initial Sample Approval Request)-
JIT:实时管理 (Just In Time)
QCC :品管圈 (Quality Control Circle)
Engineering Department (工程部)
TQEM: Total Quality Environment Management
(全面质量环境管理)
PD: Production Department (制造)
LOG: Logistics (后勤支持)
Shipping: (进出口)
AOQ:Average Output Quality平均出货品质
AOQL:Average Output Quality Level平均出货品质水平
FMEA:failure model effectiveness analysis失效模式分析
CRB: Change Review Board (工程变更会议)
CSA:Customer Simulate Analysis客户模拟分析
SQMS:Supplier Quality Management System供应商质量管理系统
QIT: Quality Improvement Team 质量改善小组
QIP:Quality Improvement Plan质量改善计划
CIP:Continual Improvement Plan持续改善计划
M.Q.F.S: Material Quality Feedback Sheet (来料质量回馈单)
SCAR: Supplier Corrective Action Report (供货商改善对策报告)
8D Sheet: 8 Disciplines sheet ( 8D单)
PDCA:PDCA (Plan-Do-Check-Action) (管理循环)
MPQ: Material Packing Quantity (物料最小包装量)
DSCN: Delivery Schedule Change Notice (交期变更通知)
QAPS: Quality Assurance Process Sheet (质量工程表)
作者: 蓝臭臭    时间: 2011-10-29 22:52
了解了。謝謝LZ ......




欢迎光临 标准下载论坛 (http://bbs.bzxzk.net/) Powered by Discuz! X3.2